Phase 1 on the wifi project at the National Theatre now completed by Barons Electrical. Running 200 x cat5e  data cables with containment including metal trunking,White plastic conduit and steel conduit for the APs.
Phase 1 on the wifi project at the National Theatre now completed by Barons Electrical. Running 200 x cat5e  data cables with containment including metal trunking,White plastic conduit and steel conduit for the APs.