Job completed for the opera house installing 2 x 8 core and 2 x 16 core OM4 multi mode fibre […]
Category: Blog
DATA CAB UPGRADE COMPLETE FOR LIBERTY COMS ROOM
Completed job at Liberty retail centre creating more space in the comms room by condensing 8 x 48 way 1u […]
Liberty Shopping Centre works underway
Started job at Liberty shopping centre condensing 7 x 48 way 1 U data cabs and tidying all patch leads […]
S5 data cabinet job completed
Completed job re arranging S5 data cabinet making more room for cable management and tidying up all patch leads. The […]
Ritz Casino Job Completed.
Job completed at the Ritz Casino supplying and installing 2 x OM3 8 core cables for the new offices in […]
Further works at Ritz Casino completed.
Another job complete running 10 x cat5e data cables for Ritz Casino.
National Theatre Job won.
Another job won at the national theatre running 2 x OM3 multimode 4 core fibre optic cables for new data […]
Lyttelton Theatre data cable job completed/
Job completed in the Lyttelton theatre installing 10 x cat 5e data cables for the new wireless APs.
September
06
2016

Before Photo of Recent work with data cables
September
06
2016
